Time:2020/4/30Author:adminClick:
1978
The safety monitoring of building lightning protection devices began in the early 1990s, and this work is subordinate to the meteorological authorities at all levels. With the development of economy and society, the detection project has gradually developed from direct lightning grounding test to side lightning measurement, anti-lightning surge intrusion measurement, anti-lightning induction measurement, equipotential connection measurement, surge protector measurement and anti-static grounding measurement It is a comprehensive detection system for the main content. Detailed information Anhui lightning protection detection will talk to you in detail.
The testing agency under the meteorological department has also developed, and has successively established lightning protection detection stations, lightning protection monitoring centers, and lightning protection offices. The detection personnel have been developed from part-time personnel to full-time lightning protection personnel. The testing equipment has also been updated from the only ground shaking meter to digital ground resistance tester, earth ground resistance tester, equipotential tester, surge protector patrol tester and other special instruments. The lightning protection inspection industry is becoming more and more formal, and it is necessary to have professional inspection qualifications and obtain measurement certification to issue legal inspection reports. New projects need to carry out lightning protection completion testing, and the projects put into use should carry out regular lightning protection testing, regardless of technical specifications or laws and regulations have clear provisions. Therefore, as an important part of safety work, lightning protection detection is widely understood and accepted by the government and safety responsibility subjects.
A few days ago, the China Meteorological Administration issued a notice requesting to actively perform the management duties of the lightning disaster prevention organization of the meteorological department, and further strengthen the safety supervision of lightning protection and disaster reduction. Disciplinary awareness, adhere to the five red lines in the work: First, all administrative approvals must not be charged, including lightning protection device testing qualification certification, lightning protection device design review and completion acceptance; second, the canceled administrative approval intermediary service, lightning evaluation and lightning protection Product testing can no longer be linked to approval and can not be used as a prerequisite for approval; third, it is converted to technical services after acceptance, technical evaluation of lightning protection device design, and detection of lightning protection devices for new construction, reconstruction, and expansion (construction) structures. In accordance with the principle of who approves, who entrusts, and who pays, the administrative counterpart shall not be charged anymore; the fourth is the evaluation of the capability of lightning protection professional technical personnel. Fifth, lightning protection inspection qualification management, resolutely open in accordance with the law, fair and just, resolute Absolutely different standards, within the tight loose outside, put an end to such acts Chinakayao